Security is cheapest and most effective while it is still a drawing. GSS integrates the protective strategy into a new build program from the concept stage, before layout and structure are fixed.

OPERATIONAL CONTEXT

Security is cheapest when it's still a drawing

Once concrete is poured, a protective strategy is constrained by whatever already exists — standoff that can't be recovered, vital areas boxed in by a layout that was never designed around them. Retrofitting security after the fact is possible, but it is rarely as effective, and it is never as cheap, as building it in.

GSS applies the inside-out methodology directly at the design stage: vital areas and target sets are identified from the design basis before siting or layout is finalized, so standoff, avenues of approach, and response positioning can still be adjusted rather than accepted as fixed constraints.

This applies to conventional new build and, with particular value, to small modular reactor programs, where compressed construction schedules make a late security retrofit especially costly to both budget and schedule.

METHODOLOGY
01Inside-Out Design BasisVital areas and target sets identified from the design basis before siting or layout is finalized.
02Concept-Stage IntegrationProtective strategy concepts incorporated alongside architectural and structural design, not after it.
03Standoff & Layout OptimizationSite layout evaluated for standoff, avenues of approach, and response positioning while it is still adjustable.
04Barrier & Detection SpecificationDelay and detection requirements specified to design engineering directly, rather than retrofit specification later.
05Licensing-Basis CoordinationSecurity design basis developed alongside the facility's licensing submissions.
06Constructability ReviewDesign reviewed against construction sequencing and cost before commitment.
CORE CAPABILITIES
Inside-out design-basis developmentConcept-stage protective-strategy integrationStandoff & site-layout optimizationBarrier & detection specificationLicensing-basis coordinationConstructability review
RELEVANT ENVIRONMENTS
Small modular reactorsNew nuclear buildOperating nuclear facilities (major modification)Other new critical-infrastructure build

Design it in before you have to build it back in